Back

The Aasta Hansteen Project

Aasta Hansteen substructure begins taking shape in South Korea. Anko is still a presence at the HHI shipyard for follow-up during construction.
As can be seen at the top of the substructure, there is a large amount of interfaces that will fit topside when these are connected in 2017.