Sotrasambandet

The project with Sotrasambandet for Hylland AS started in 2023 and is scheduled for completion in 2027.

What is being done?

A new four-lane bridge of about 900 meters is being constructed, with a separate pedestrian and bicycle path.

To ensure the project proceeds in the most orderly manner possible, it is divided into several road and tunnel projects. Our task includes delivering survey letters and mass calculations, as well as full-time field/production staking.

In 2023, the focus is on survey letters, mass calculations, and field/production staking.

Here we are in front of the entrance to the Drotningsvik tunnel on the eastern end, performing some checks.
Here you see a benchmark we have set up in the same area, 450 meters away from where we stand in picture 1.